Rates
Schedule A: Farm & Residential Service - Single Phase
- Facility Charge: $20.00 per month
- First 300 kWh per month @ 9.500 cents
- Next 400 kWh per month @ 8.920 cents
- Over 700 kWh per month @ 5.323 cents
Minimum monthly charge is the greater of the facility charge or $1.00 per KVA of installed transformer capacity.
Schedule F: Street Lights - all kWh @ 5.420 cents
Schedule H: Residential Electric Heat - all kWh @ 4.923 cents
Schedule I: Irrigation Service
- Annual charge of $20.00 per horsepower
- 3.735 cents per kWh per month
- $7.70 Non-control charge * H.P. per month (updated May 1994)
No Demand Charge if Controlled
Schedule T: Multi-Phase Farm – Up to 149 KVA
- Facility Charge: $35.00 per month
- First 200 kWh per month @ 13.551 cents
- Next 1200 kWh per month @ 9.978 cents
- Over 1400 kWh per month @ 5.471 cents
Minimum monthly charge is the greater of the facility charge or $1.00 per KVA of installed transformer capacity.
Schedule U: Multi-Phase Commercial & Large Farm – Up to 999 KVA
- All kWh @ 3.405 cents
- KW demand @ 10.50 per KW per month
Minimum monthly charge is $1.00 per KVA of installed transformer capacity.
Schedule W: Large Power - 1000 KVA and above
- All kWh @ 3.331 cents
- KW demand @ 10.50 per KW per month
Schedule X: Interruptible Controlled Service - all kWh @ 4.201 cents (Effective 10/1/2004)
Schedule Y: Interruptible Multi-Phase
- Facility Charge: $30.00 per month
- All kWh @ 3.2 cents
- Non-coincident demand @ $4.00 per KW per month
- Coincident demand @ $5.35 per KW per month
Minimum monthly charge is $1.00 per KVA of installed transformer capacity. (1997)
Schedule Z: Wheeling Service (Effective 10/17/2006)
- Facility Charge: $250.00
- All kWh @ .95 cents (.0095)
- KW demand @ $2.65 per KW per month
- Plus applicable wheeling charges and power cost.
Minimum monthly charge is the greater of the facility charge or $1.00 per KVA of installed transformer capacity.
This is a summary of retail rates. For more detailed information, contact this Cooperative office.